Workflow A3 · New
Night work windows and airside permits
What leaders see: Tonight's windows at risk and what they mean for the morning bank.
- Who runs it
- Airfield operations, GC night superintendent, airline operations control, safety
- Cadence
- Every night window; weekly planning
- Plugs into
- Work-permit systemGC daily logsWeather serviceEquipment telematicsFlight schedule
The workflow you run today, with 5 AI touchpoints
- 1Window requestGC asks for taxiway, apron or power closuresPredict
Overrun risk per window from task, crew, equipment, deliveries and weather
- 2Permit reviewSafety plan, escorts, conflictsLLM
Check permit packages against airport rules and other closures
- 3NOTAM issuedClosure published to pilots and airlines
- 4Night shiftSet up, work, quality checksWeak signals
Track progress from logs and photos; alert at 02:00 if behind
- 5Debris sweepForeign object debris inspectionVision
Help inspectors spot debris in sweep images; a person signs off
- 6ReopenBefore the first morning bank
- 7Post-window reportProductivity, overruns, incidentsPredict
Link overruns to morning delays and learn which windows run long
Highlighted steps are where AI plugs into the existing workflow. People keep every decision.
Window overrun early warning
- Past windows: planned versus actual
- Crew, equipment and delivery logs
- Weather forecast and cure-time limits (surrogate)
- Morning flight bank
- Overrun-risk model per window
- Mid-window progress tracking
- Debris-detection assist
- LLM planning brief
- GC and airfield ops right-size scope or add contingency
- Go or no-go at the mid-window check
- Plan windows that finish on time
- Warn operations control the evening before
- Every window's result retrains the risk model
What changes
- Windows sized to what can finish
- Airline warned the evening before when the morning bank is at risk
- Debris checks assisted, with a person's sign-off
How we measure it
| KPI | Today | With GTU | Type |
|---|---|---|---|
| Windows reopened on time | Today's baseline | More | Planning target |
| Overrun minutes per window | Today's baseline | Fewer | Planning target |
| Morning delays caused by construction | Attributed after the fact | Predicted the evening before; fewer | New measure |
| Productive work per window | Over- or under-scoped | More, with right-sized scope | Planning target |
| Debris missed at reopening | Today's baseline | Less, with assisted inspection | Planning target |
Targets are set with your team and tested in a pilot before anything scales.
Proof from our work: Area clearance and prioritization (the same shape as debris control), and weak-signal early warning. Humanitarian demining dashboard · Pandemic Pulse
Next step
Run this workflow on your data.
Start with a free 30-minute discovery call. Most teams pilot one touchpoint first.